2727 sw snyder blvd, ankeny, ia 50023

1 (888) 964-2020



navigation

back to projects | project categories: trails

from des moines to carlisle on the karras-kaul connector trail

central iowa’s trail network is expanding with the carlisle multi-use trail connection, now known as the karras-kaul connector trail. spearheaded by des moines city leaders, this 3.2-mile trail segment was developed in collaboration with the engineering team at snyder & associates to bridge a critical gap between the polk and warren county trail systems. by connecting the easter lake spine trail in des moines to the city of carlisle and the summerset trail, this project enables seamless travel for pedestrians and cyclists across central iowa’s scenic landscapes, establishing a new recreational corridor for residents and visitors alike.

an essential link connecting trails & communities

the karras-kaul connector trail serves as a vital component in central iowa’s trail network, linking the easter lake spine trail to trail networks in warren county, including the summerset trail. starting at the easter spine trail crossing on east army post road, the project transforms an at-grade crossing into a safe, grade-separated one through the installation of a new 12’x9’ reinforced concrete box culvert (rcbc) pedestrian tunnel.

from there, the trail moves southward through the picturesque fields of southeast des moines, crossing east pine avenue and se 36th street, then following se 38th street along the shoulder. after passing under the highway 5 bridge to enter warren county, the trail continues along e county line road, where it connects to the city of carlisle trail system at 150th avenue. with this connection, the trail provides uninterrupted travel across an 85.4-mile route stretching from jefferson in greene county to indianola, creating a continuous pathway for outdoor enthusiasts.

expert coordination & environmental care

snyder & associates brought its multidisciplinary expertise to this transformative project, offering project administration, civil and structural engineering, topographic surveying, environmental studies, and 世界杯足球比赛预选赛 engagement for right-of-way (row) acquisition. successful 世界杯足球比赛预选赛 outreach efforts involved collaboration with five property owners to secure the necessary row for the trail’s alignment, demonstrating a commitment to community involvement and transparency.

beyond row acquisition, the project scope also included bat habitat surveys, regenerative stream improvements, and extensive utility coordination, including with the oneok pipeline. through snyder & associates’ meticulous 2022世界杯32强预选赛 and execution, the team delivered a trail design that prioritizes user safety, sustainability, and habitat preservation.

creating uninterrupted recreational pathways

the completion of the karras-kaul connector trail will integrate with iowa’s vast trail network, allowing for continuous travel through various landscapes and local landmarks. cyclists, hikers, and walkers will experience a scenic, connected pathway without leaving designated trails. this new link not only expands recreational access but also strengthens community connections, promotes active lifestyles, and encourages appreciation for iowa’s natural beauty.

building a legacy of connectivity & community engagement

the karras-kaul connector trail is a testament to the transformative impact of infrastructure projects that prioritize connectivity and accessibility. through the dedication of des moines city officials and snyder & associates, this trail project highlights the power of community-driven development and environmental stewardship. as the trail opens, it will offer countless opportunities for exploration and engagement, linking communities and celebrating iowa’s rich landscape and heritage.

client

city of des moines

client type

project type

rich voelker, p.e.

rich voelker, p.e.

transportation business unit leader

related projects

a man running on trail underneath bridge|creek bank underneath bridge|map of the new clear creek trail alignment around the interstate 80/380 interchange|workers install one of the bridges over clear creek|decorative concrete castings for clear creek trail connection|clear creek trail connection bridge|trail underneath bridge in coralville iowa

clear creek trail connection fills critical multi-modal gap: coralville, iowa

the clear creek trail project has emerged as a significant addition to the ongoing efforts to enhance connectivity and recreational opportunities in johnson county....
|||aerial rendering of hickman and interstate 35/80 diverging diamond interchange.||street level rendering of hickman and interstate 35/80 diverging diamond interchange.|||rendering of pedestrian tunnel underneath interstate 35/80 at hickman road diverging diamond interchange.|bridge abutments design treatment underneath interstate 35/80 diverging diamond interchange bridge.|||median treatment rendering underneath interstate 35/80 diverging diamond interchange bridge.|two pedestrian bridges over the interstate onramps

progress on the interstate 35/80 & u.s. 6 diverging diamond interchange upgrade

the exponential growth of communities, particularly in the western suburbs of des moines, has been nothing short of remarkable. the population of waukee, for example,...
||||

cedar heights drive reconstruction continues cedar falls corridor upgrades

for several years, the cedar falls community has been expanding its transportation network along the southern edge of town, including the greenhill road corridor. this...
||||||indian creek trail connection ribbon cutting

indian creek trail connection unites key marion neighborhoods

having doubled in population over the past three decades, the cedar rapid’s suburb of marion has been the dual beneficiary of a rapidly expanding metro area and the...
fixed up railroad bridge into a trail bridge|summer time light hits the trail bridge and water below|engineering interns learning how to pave the roads|shaded trail bridge|brand new trail bridge with beautiful greenery|black gated fence around a trail route|construction happening on a old railroad bridge

river’s edge trail connects iowa’s heartland

while it's been many years in the making and still has many miles remaining to construct, the river's edge trail is ideally positioned to take advantage of the scenic...
bike trail winding through the green forest|trail with black fencing one either side|freshly paved trail goes uphill towards a tree line|incomplete trail bridge|map of the rolling prairie trail system|paving underway in the middle of a storm|trail water drainage

rolling prairie trail provides rural link across iowa’s scenic landscape

when rail transportation in iowa peaked in the early 1900s, the state was home to more than 10,500 miles of track. as automobiles became the preferred mode of...
|prairie city welcome signage town square|large green plants and trees on either side of a bike trail|winding trail heads towards a casey's gas station|child bikes a trail through a small town in iowa|small town welcome sign with a trail and road next to it|prairie city town square||

red rock prairie trail provides scenic recreational opportunities

most trail 2022世界杯32强预选赛 in central iowa over the past two decades has centered around making connections. whether connecting small communities or social venues, providing...
bridge on the railroad highway trail|pre-construction of the railroad highway trail|bridge on the railroad highway trail|trail pavement of the railroad highway trail|map of the railroad highway trail

railroad highway trail connects western iowa communities

now standing at more than 50% complete, the dream of a completely off-roadway, multi-use trail network spanning the entire country keeps taking steps to becoming...
high trestle trail pedestrian bridge at night|oralabor road trail bridge|many citizens gathered for a bike ride|oralabor road trail bridge under construction|the snyder and associates transportation team for oralabor road trail bridge|many bicyclists riding along the high trestle trail bridge|family smiling as they ride across a trail bridge on bikes||||rich voelker

pedestrian tunnel & bridge showcase trail extension in ankeny — high trestle trail

shortly after the high trestle trail bridge over the des moines river was completed in 2011, the focus quickly shifted to continuing the trail south through the ankeny...
thick metal signage with large text|bicyclist ride past the council bluffs fire station|before construction on first ave|bicyclist happily wave at on down the bike trail|first ave trail in council bluffs|asphalt trail along high school athletic facilities|council bluffs bike trail

first avenue trail creates council bluffs connection

formally adopted by the city of council bluffs in 2015, the west broadway corridor plan was developed to guide the transformation of this busy stretch of roadways into...

more than 45 years

serving clients around the country

db+