projects - snyder & associates - engineers and planners - 世界杯2022年预选赛 //www.dicovercards.com wed, 12 nov 2025 16:02:31 +0000 en-us hourly 1 //www.dicovercards.com/wp-content/uploads/2025/06/cropped-cropped-snyder_meatball-1-32x32.png projects - snyder & associates - engineers and planners - 世界杯2022年预选赛 //www.dicovercards.com 32 32 site design & sustainability drive sun prairie library expansion //www.dicovercards.com/projects/site-design-sustainability-drive-sun-prairie-library-expansion/ wed, 12 nov 2025 16:02:31 +0000 //www.dicovercards.com/?post_type=project&p=11349318 snyder & associates played a central role in the 2022世界杯32强预选赛 and site design for the sun prairie 世界杯足球比赛预选赛 library expansion and renovation project. this $26 million investment will nearly double the facility’s size to meet the needs of one of wisconsin’s fastest-growing communities. in collaboration with the city of sun prairie, the library board, and […]

the post site design & sustainability drive sun prairie library expansion first appeared on 华体会英超赞助商 - engineers and planners.

]]>
snyder & associates played a central role in the 2022世界杯32强预选赛 and site design for the sun prairie 世界杯足球比赛预选赛 library expansion and renovation project. this $26 million investment will nearly double the facility’s size to meet the needs of one of wisconsin’s fastest-growing communities. in collaboration with the city of sun prairie, the library board, and feh design, our team developed a site plan that complements the library’s architecture, enhances connections to nearby 世界杯足球比赛预选赛 spaces, and supports the community’s long-term growth.

designing a connected, sustainable site

located beside sheehan park and the sun prairie community gardens, the expanded library site creates a seamless link between indoor and outdoor learning environments. the snyder & associates 2022世界杯美洲杯预选赛 and landscape architecture teams designed sidewalks and trails that connect the library to the surrounding park system, providing safe and accessible routes for all visitors. the site also features outdoor classroom areas and amphitheater-style seating for performances and community gatherings, promoting creativity and engagement.

sustainability guided every design decision. working with the electrical and plumbing consultants, our engineers integrated geothermal wells and planned for future solar panel installations to reduce the library’s environmental footprint. these improvements align with the city’s sustainability goals and the library’s commitment to energy efficiency and stewardship.

efficient grading & thoughtful detailing

one of the project’s key challenges involved managing a surplus of fill material. snyder & associates developed a grading plan that balanced earthwork needs and minimized soil removal. grading berms were strategically placed to buffer the site from traffic along linnerud drive, improving aesthetics and reducing noise for patrons enjoying the new outdoor spaces.

the landscape plan emphasized preservation and enhancement of natural features. our team worked with city forestry staff to relocate donor trees and restore native prairie vegetation that complements the surrounding landscape. these efforts will create an inviting and ecologically balanced setting that encourages outdoor exploration.

a welcoming, future-ready destination

set for completion in early 2026, the expanded sun prairie 世界杯足球比赛预选赛 library will feature a terrazzo-floored atrium, enlarged bookstore and café, outdoor amphitheater, dedicated caregiving and sensory rooms, and recording studios for local creators. renewable energy systems, including geothermal and solar, will further the city’s sustainability objectives.

library leaders describe the amphitheater as a one-of-a-kind regional feature, offering space for performances, outdoor readings, and educational events. together with the new interior spaces, these enhancements will transform the library into a true community destination where learning, culture, and connection thrive.

from initial 2022世界杯32强预选赛 through construction administration, snyder & associates is proud to help deliver a project that reflects sun prairie’s dedication to education, sustainability, and community growth. the new library campus will serve as a welcoming, accessible space for generations to come.

the post site design & sustainability drive sun prairie library expansion first appeared on 华体会英超赞助商 - engineers and planners.

]]>
8th avenue reconstruction & mount vernon road rehabilitation – cedar rapids, iowa //www.dicovercards.com/projects/8th-avenue-reconstruction-mount-vernon-road-rehabilitation-cedar-rapids-iowa/ tue, 28 oct 2025 12:31:37 +0000 //www.dicovercards.com/?post_type=project&p=11348996 the 8th avenue reconstruction & mount vernon road rehabilitation project, designed by snyder & associates, represents one of cedar rapids’ most significant recent investments in 世界杯足球比赛预选赛 infrastructure. extending from 8th street se to 20th street se, the project improved safety, mobility, and aesthetics along a key urban corridor used by more than 20,000 vehicles daily. […]

the post 8th avenue reconstruction & mount vernon road rehabilitation – cedar rapids, iowa first appeared on 华体会英超赞助商 - engineers and planners.

]]>
the 8th avenue reconstruction & mount vernon road rehabilitation project, designed by snyder & associates, represents one of cedar rapids’ most significant recent investments in 世界杯足球比赛预选赛 infrastructure. extending from 8th street se to 20th street se, the project improved safety, mobility, and aesthetics along a key urban corridor used by more than 20,000 vehicles daily. delivered in two phases, the effort combined a full reconstruction with a new roundabout between 8th and 14th streets and a pavement rehabilitation between 14th and 20th streets. together, these improvements fulfilled the goals of the mount vernon road corridor action plan to create a safer, more walkable, and visually cohesive gateway into the city.

redefining a complex urban intersection

at the heart of the project is cedar rapids’ first multilane roundabout, replacing a complex, high-crash intersection where 8th avenue, 10th street, and mount vernon road converge. the new roundabout reduces conflict points, calms traffic, and improves efficiency while enhancing pedestrian safety.

with over 30 feet of elevation change across the site and proximity to mercy medical center, unitypoint clinics, and mckinley middle school, the design required innovative grading and the construction of multiple retaining walls, some nearly 20 feet tall. these walls stabilized slopes, preserved access, and reduced right-of-way needs.

pedestrian safety features include rectangular rapid flashing beacons (rrfbs), splitter islands, and refuge zones that allow pedestrians to cross only two lanes at a time. the outdated pedestrian bridge east of the intersection was removed and replaced with ada-compliant, ground-level crossings, aligning with cedar rapids’ multimodal transportation vision.

innovative and sustainable design solutions 

throughout the corridor, the design team implemented innovative engineering materials and methods. a geosynthetic cementitious composite mat known as concrete canvas was installed near mckinley middle school to control stormwater infiltration and protect a large retaining wall. the material provides a thin, joint-free, and durable surface, reducing both material use and installation time compared to conventional concrete channels.

to achieve the required vertical clearance for the new mercy hospital skywalk, engineers designed a reinforced concrete arch pipe system with a cast-in-place cap that provided sufficient stormwater capacity beneath the roadway without raising the street profile. both the reconstruction and rehabilitation segments incorporated geogrid reinforcement to strengthen the pavement while reducing excavation and backfill needs. in the rehabilitation zone, an asphalt interlayer was used to prevent reflective cracking and extend pavement life.

rehabilitation and long-term maintenance

from 14th to 20th streets, the project focused on pavement rehabilitation and preventive maintenance to extend the service life of mount vernon road. the work included drainage upgrades, new subdrains, and reconstructed curb-and-gutter systems designed to simplify future overlays and minimize waste.

two new three-quarter intersections at 15th and 19th streets improved traffic flow and safety by reducing conflict points while maintaining access to neighborhood streets. this efficient, sustainable approach allowed the city to deliver long-lasting improvements while conserving resources and preparing the corridor for easier future maintenance.

coordinating a complex urban corridor

mount vernon road serves as a major arterial for businesses, residents, and emergency services. the design team worked closely with numerous partners to manage utilities, traffic control, and construction sequencing. relocating 69-kv power lines out of the corridor improved sight distance, lane widths, and turning movements while supporting safety goals.

utility coordination involved multiple agencies, including lumen technologies, itc midwest, mediacom, midamerican energy, verizon, and mercy medical facility. thousands of fiber-optic and copper lines were relocated through an extensive documentation and coordination process, ensuring the project stayed on schedule.

maintaining access to key destinations, including mercy hospital’s emergency department, was a top priority. a detailed, multi-phase traffic control plan kept one lane open in each direction through most of construction. regular communication with emergency services, businesses, and the medquarter district ensured uninterrupted access and a high level of community support.

community and environmental benefits

beyond technical success, the project provides lasting value to cedar rapids residents. new sidewalks and shared-use paths improve walkability and connect neighborhoods to medical, employment, and transit centers. sustainable features such as roundabouts that reduce vehicle idling, geogrid and concrete canvas applications, and native, low-maintenance landscaping lower emissions, conserve resources, and reduce maintenance costs.

the project also respected local heritage by preserving the historic oak hill cemetery wall and using ground-penetrating radar to avoid disturbing unmarked graves. many residential retaining walls were replaced with uniform segmental block systems that improved safety and corridor appearance while increasing neighborhood property values.

driving revitalization and private investment

the mount vernon road project directly supports the city’s long-term plan for improved circulation, pedestrian access, and corridor aesthetics. it has already spurred new commercial and residential investment, including the $40 million mercy medical jewel & jim plumb heart center and other redevelopment projects.

enhanced travel flow, wider lanes, and ada-compliant sidewalks and crossings improve safety for all users while helping emergency vehicles reach hospitals more efficiently.

through careful 2022世界杯32强预选赛 and collaboration, snyder & associates helped cedar rapids transform an aging, congested corridor into a safe, sustainable, and vibrant urban gateway that reflects the community’s vision for the future.

the post 8th avenue reconstruction & mount vernon road rehabilitation – cedar rapids, iowa first appeared on 华体会英超赞助商 - engineers and planners.

]]>
3rd street northeast reconstruction – belmond, iowa //www.dicovercards.com/projects/3rd-street-northeast-reconstruction-belmond-iowa/ tue, 07 oct 2025 15:36:56 +0000 //www.dicovercards.com/?post_type=project&p=11348673 modernizing infrastructure and enhancing connectivity in belmond to address aging infrastructure and improve overall street conditions, the city of belmond partnered with snyder & associates to lead the design and construction of the 3rd street northeast reconstruction – phase 2 project. the improvements focused on a 1,775-foot corridor, including 3rd street ne from 1st avenue […]

the post 3rd street northeast reconstruction – belmond, iowa first appeared on 华体会英超赞助商 - engineers and planners.

]]>
modernizing infrastructure and enhancing connectivity in belmond

to address aging infrastructure and improve overall street conditions, the city of belmond partnered with snyder & associates to lead the design and construction of the 3rd street northeast reconstruction – phase 2 project. the improvements focused on a 1,775-foot corridor, including 3rd street ne from 1st avenue ne to 6th avenue ne and a portion of 2nd avenue ne between 3rd and 4th streets ne. this project delivered significant upgrades to both surface and subsurface infrastructure, improving reliability and safety for residents, businesses, and pedestrians.

full corridor reconstruction with utility upgrades

the project involved the complete removal and replacement of deteriorated pavement, sidewalks, and driveway approaches. all pedestrian facilities were upgraded to meet ada compliance, improving walkability and safety throughout the neighborhood. beneath the roadway, the reconstruction included replacement of critical underground infrastructure, such as water mains, sanitary sewers, and storm sewer lines.

excavation depths of up to 10 feet were necessary to install the new sanitary sewer and water main systems. these improvements not only addressed aging utilities but also provided enhanced service reliability for homes and businesses along the corridor.

improved stormwater management

to reduce the risk of localized flooding and improve overall drainage capacity, the project team upgraded the storm sewer system with additional street intakes and larger-diameter piping. these enhancements were designed to handle increased runoff more effectively during storm events, supporting the city’s long-term stormwater management goals.

phased construction and community coordination

construction was carefully staged to maintain access to homes and businesses throughout the duration of the project. coordination with utility providers allowed for the proactive relocation of gas, electric, and communication lines prior to major roadway work. 世界杯足球比赛预选赛 engagement was a key focus, with residents receiving advance notice of sidewalk closures and temporary water service disruptions to minimize inconvenience.

long-term community benefits

by integrating roadway, utility, and pedestrian improvements into a single, well-coordinated effort, the 3rd street northeast reconstruction – phase 2 project has delivered a modern, durable transportation corridor that meets current standards and anticipates future community needs. the project reflects the city of belmond’s commitment to infrastructure investment and quality of life for its residents.

the post 3rd street northeast reconstruction – belmond, iowa first appeared on 华体会英超赞助商 - engineers and planners.

]]>
enhancing access at atwater park, village of shorewood, wisconsin //www.dicovercards.com/projects/enhancing-access-at-atwater-park-village-of-shorewood-wisconsin/ tue, 07 oct 2025 15:35:41 +0000 //www.dicovercards.com/?post_type=project&p=11348941 perched atop a bluff 100 feet above the shores of lake michigan, atwater park is one of shorewood’s most iconic civic spaces. serving as a passive park, community gathering spot, and direct connection to the lakefront, the park embodies both the village’s heritage and its recreational future. the village of shorewood partnered with snyder & […]

the post enhancing access at atwater park, village of shorewood, wisconsin first appeared on 华体会英超赞助商 - engineers and planners.

]]>
perched atop a bluff 100 feet above the shores of lake michigan, atwater park is one of shorewood’s most iconic civic spaces. serving as a passive park, community gathering spot, and direct connection to the lakefront, the park embodies both the village’s heritage and its recreational future. the village of shorewood partnered with snyder & associates to develop a master plan that addressed failing hardscape surfaces, deteriorating landscapes, and the long-term circulation challenges for both maintenance vehicles and pedestrians.

the plan was envisioned not only as a response to ongoing maintenance issues but also as a blueprint for celebrating the park’s historical character. by blending design sensitivity with practical infrastructure improvements, our team sought to ensure the park remains a vibrant community destination for generations to come.

balancing maintenance needs with civic character

the project aimed to accomplish three critical objectives. first, it was necessary to establish a safe and reliable maintenance path on the park’s upper level that could handle larger service vehicles. second, the design needed to reduce impervious surfaces and simplify the materials used throughout the site to promote sustainability and ease of upkeep. finally, the park improvements had to reflect its role as a civic landmark by reinforcing its historic character and supporting its identity as a community gathering place.

early collaboration with shorewood’s 世界杯足球比赛预选赛 works department ensured that staff input directly shaped design concepts. special attention was given to the steep grades and tight turn radii that complicate the movement of large fleet vehicles, balancing those functional requirements with the park’s broader community uses.

preserving views and overcoming site challenges

the site’s unique topography presented significant challenges. steep slopes and narrow paths complicated maintenance access, while the park’s cultural value demanded preservation of key visual connections to lake michigan and the historic shipwreck just offshore. at the same time, the project required careful coordination with improvements planned along an adjacent state route, ensuring the two efforts would align seamlessly without diminishing the park’s functionality or character.

drawing inspiration from the park’s history

to develop solutions rooted in both practicality and respect for heritage, snyder & associates turned to historic imagery and aerial photographs to study the park’s evolution over time. this research revealed circulation patterns and design elements that informed decisions about which pedestrian routes should be maintained, simplified, or reintroduced.

the resulting plan reduced the number of unnecessary sidewalk segments, streamlining movement through the park while lowering long-term maintenance needs. plaza spaces were incorporated to highlight existing 世界杯足球比赛预选赛 art and provide flexible gathering points. by reducing impervious surfaces, the design also enhanced bluff stability and minimized erosion risks, offering long-term environmental benefits that strengthen the site’s resilience.

engaging the community and securing support

世界杯足球比赛预选赛 engagement was a cornerstone of the 2022世界杯32强预选赛 process. the snyder & associates team collaborated with 世界杯足球比赛预选赛 works staff to lead community workshops, present design options, and gather valuable feedback from residents. these efforts ensured that the final plan reflected community priorities while also aligning with practical maintenance needs. to support long-term implementation, cost estimates were developed and shared with the parks committee, helping position the village to secure funding through its capital improvement plan.

a vision approved for the future

the master plan ultimately gained approval from both the parks committee and the village council and will be adopted into shorewood’s comprehensive parks and open space plan. among the key achievements were the creation of a maintenance path designed for large fleet vehicles, the preservation and enhancement of sweeping views over lake michigan, and the integration of sustainable design strategies that reduce impervious surfaces and protect the bluff.

by weaving together historical preservation, practical maintenance solutions, and sustainable design practices, snyder & associates created a plan that honors atwater park’s storied past while preparing it for a resilient future. with its approval, the village of shorewood now has a clear framework to continue investing in one of its most treasured community assets.

the post enhancing access at atwater park, village of shorewood, wisconsin first appeared on 华体会英超赞助商 - engineers and planners.

]]>
hickman road & se legacy pointe / nw 161st street intersection improvements //www.dicovercards.com/projects/hickman-road-se-legacy-pointe-nw-161st-street-intersection-improvements/ mon, 15 sep 2025 13:46:55 +0000 //www.dicovercards.com/?post_type=project&p=11348661 to support long-term traffic efficiency and corridor consistency along hickman road, the cities of clive and waukee partnered on a joint project to reconstruct and upgrade a key segment of se legacy pointe boulevard. snyder & associates served as the lead design consultant for this effort, which enhances multimodal access, improves stormwater quality, and supports […]

the post hickman road & se legacy pointe / nw 161st street intersection improvements first appeared on 华体会英超赞助商 - engineers and planners.

]]>
to support long-term traffic efficiency and corridor consistency along hickman road, the cities of clive and waukee partnered on a joint project to reconstruct and upgrade a key segment of se legacy pointe boulevard. snyder & associates served as the lead design consultant for this effort, which enhances multimodal access, improves stormwater quality, and supports continued growth in the surrounding area.

upgrading to a consistent boulevard design

located just south of the busy hickman road intersection, this one-block segment of legacy pointe boulevard was reconstructed to match the boulevard configuration of adjacent roadway sections. the work included full-depth pcc pavement construction, new sidewalks, accessible pedestrian ramps, and a raised median — all aimed at improving traffic operations, reducing conflict points, and promoting pedestrian safety.

traffic signal upgrades at the intersection of hickman road and se legacy pointe/nw 161st street were incorporated into the project, along with new pavement markings and signage to clearly define lane usage and turning movements.

sustainable stormwater management

given the city’s emphasis on stormwater quality, snyder & associates developed a drainage solution that captures and treats runoff on site. the design features vegetated drainage swales with underground rock chambers that filter the “first flush” of stormwater, removing pollutants and reducing the environmental impact of roadway runoff. this system meets municipal stormwater requirements while supporting the aesthetic goals of the corridor.

maintaining access during construction

with high traffic volumes and nearby commercial development, traffic control and construction phasing were carefully planned to minimize disruption. throughout construction, the project team maintained access for businesses and the traveling 世界杯足球比赛预选赛 , prioritizing safety and continuity.

this successful collaboration between two growing metro-area communities is a model for phased, multi-jurisdictional infrastructure improvements that balance immediate needs with long-term performance and sustainability.

the post hickman road & se legacy pointe / nw 161st street intersection improvements first appeared on 华体会英超赞助商 - engineers and planners.

]]>
from des moines to carlisle on the karras-kaul connector trail //www.dicovercards.com/projects/from-des-moines-to-carlisle-on-the-karras-kaul-connector-trail/ //www.dicovercards.com/projects/from-des-moines-to-carlisle-on-the-karras-kaul-connector-trail/#respond mon, 09 jun 2025 09:11:15 +0000 //www.dicovercards.com/project/from-des-moines-to-carlisle-on-the-karras-kaul-connector-trail/ central iowa’s trail network is expanding with the carlisle multi-use trail connection, now known as the karras-kaul connector trail. spearheaded by des moines city leaders, this 3.2-mile trail segment was developed in collaboration with the engineering team at snyder & associates to bridge a critical gap between the polk and warren county trail systems. by […]

the post from des moines to carlisle on the karras-kaul connector trail first appeared on 华体会英超赞助商 - engineers and planners.

]]>
central iowa’s trail network is expanding with the carlisle multi-use trail connection, now known as the karras-kaul connector trail. spearheaded by des moines city leaders, this 3.2-mile trail segment was developed in collaboration with the engineering team at snyder & associates to bridge a critical gap between the polk and warren county trail systems. by connecting the easter lake spine trail in des moines to the city of carlisle and the summerset trail, this project enables seamless travel for pedestrians and cyclists across central iowa’s scenic landscapes, establishing a new recreational corridor for residents and visitors alike.

an essential link connecting trails & communities

the karras-kaul connector trail serves as a vital component in central iowa’s trail network, linking the easter lake spine trail to trail networks in warren county, including the summerset trail. starting at the easter spine trail crossing on east army post road, the project transforms an at-grade crossing into a safe, grade-separated one through the installation of a new 12’x9’ reinforced concrete box culvert (rcbc) pedestrian tunnel.

from there, the trail moves southward through the picturesque fields of southeast des moines, crossing east pine avenue and se 36th street, then following se 38th street along the shoulder. after passing under the highway 5 bridge to enter warren county, the trail continues along e county line road, where it connects to the city of carlisle trail system at 150th avenue. with this connection, the trail provides uninterrupted travel across an 85.4-mile route stretching from jefferson in greene county to indianola, creating a continuous pathway for outdoor enthusiasts.

expert coordination & environmental care

snyder & associates brought its multidisciplinary expertise to this transformative project, offering project administration, civil and structural engineering, topographic surveying, environmental studies, and 世界杯足球比赛预选赛 engagement for right-of-way (row) acquisition. successful 世界杯足球比赛预选赛 outreach efforts involved collaboration with five property owners to secure the necessary row for the trail’s alignment, demonstrating a commitment to community involvement and transparency.

beyond row acquisition, the project scope also included bat habitat surveys, regenerative stream improvements, and extensive utility coordination, including with the oneok pipeline. through snyder & associates’ meticulous 2022世界杯32强预选赛 and execution, the team delivered a trail design that prioritizes user safety, sustainability, and habitat preservation.

creating uninterrupted recreational pathways

the completion of the karras-kaul connector trail will integrate with iowa’s vast trail network, allowing for continuous travel through various landscapes and local landmarks. cyclists, hikers, and walkers will experience a scenic, connected pathway without leaving designated trails. this new link not only expands recreational access but also strengthens community connections, promotes active lifestyles, and encourages appreciation for iowa’s natural beauty.

building a legacy of connectivity & community engagement

the karras-kaul connector trail is a testament to the transformative impact of infrastructure projects that prioritize connectivity and accessibility. through the dedication of des moines city officials and snyder & associates, this trail project highlights the power of community-driven development and environmental stewardship. as the trail opens, it will offer countless opportunities for exploration and engagement, linking communities and celebrating iowa’s rich landscape and heritage.

the post from des moines to carlisle on the karras-kaul connector trail first appeared on 华体会英超赞助商 - engineers and planners.

]]>
//www.dicovercards.com/projects/from-des-moines-to-carlisle-on-the-karras-kaul-connector-trail/feed/ 0
creating a safer, smarter space for animal services in des moines //www.dicovercards.com/projects/creating-a-safer-smarter-space-for-animal-services-in-des-moines/ //www.dicovercards.com/projects/creating-a-safer-smarter-space-for-animal-services-in-des-moines/#respond mon, 09 jun 2025 09:11:15 +0000 //www.dicovercards.com/project/creating-a-safer-smarter-space-for-animal-services-in-des-moines/ at the corner of se 14th and harriett streets in des moines, a forward-thinking facility now stands as a beacon of care for animals and the community. the new des moines animal services facility replaces an outdated structure, introducing a modern, flood-resilient space that improves animal welfare and enhances 世界杯足球比赛预选赛 engagement. engineering resilience near the […]

the post creating a safer, smarter space for animal services in des moines first appeared on 华体会英超赞助商 - engineers and planners.

]]>
at the corner of se 14th and harriett streets in des moines, a forward-thinking facility now stands as a beacon of care for animals and the community. the new des moines animal services facility replaces an outdated structure, introducing a modern, flood-resilient space that improves animal welfare and enhances 世界杯足球比赛预选赛 engagement.

engineering resilience near the river

snyder & associates provided essential 2022世界杯美洲杯预选赛 services for the new facility, including detailed site grading, utility layout, and stormwater management design. the site’s proximity to the des moines river and its levee system presented unique challenges, particularly the limited drainage capacity and the need for integration with the city’s stormwater pump system. our team tackled these issues through strategic grading and innovative water quality improvements that enhance the site’s long-term resilience.

working in close collaboration with the city of des moines, the design team at office of hartman spiller trapp (office hst), and other project partners, snyder & associates helped develop a safe and functional site that supports the facility’s critical services. our design also incorporated an off-site sanitary sewer extension, ensuring reliable utility service and smooth facility operations.

a foundation for care & connection

the result is a 22,000-square-foot facility that reflects the city’s commitment to both animal welfare and community well-being. designed with the animal rescue league of iowa, the building features animal housing, adoption spaces, a veterinary clinic, and outdoor exercise areas. elevated three feet above grade for flood resilience, the site and structure work together to mitigate flood risks without exceeding levee heights.

beyond engineering, the project’s success lies in its mission — transforming 世界杯足球比赛预选赛 perceptions of animal shelters. with natural daylight, calming outdoor trails, and strategically separated spaces to reduce animal stress, the facility promotes interaction and adoption while prioritizing health and safety.

snyder & associates is proud to have contributed to this project, ensuring that the new des moines animal services facility is built on a solid, sustainable foundation, ready to serve pets and people for years to come.

the post creating a safer, smarter space for animal services in des moines first appeared on 华体会英超赞助商 - engineers and planners.

]]>
//www.dicovercards.com/projects/creating-a-safer-smarter-space-for-animal-services-in-des-moines/feed/ 0
madison’s first permanent men’s shelter prioritizes sustainability & dignity //www.dicovercards.com/projects/madisons-first-permanent-mens-shelter-prioritizes-sustainability-dignity/ //www.dicovercards.com/projects/madisons-first-permanent-mens-shelter-prioritizes-sustainability-dignity/#respond mon, 09 jun 2025 09:11:06 +0000 //www.dicovercards.com/project/madisons-first-permanent-mens-shelter-prioritizes-sustainability-dignity/ for decades, men experiencing homelessness in madison sought shelter in temporary spaces, often in church basements or emergency accommodations. that will soon change with the construction of the city’s first permanent men’s homeless shelter, bartillon shelter. located at 1902 bartillon drive near reindahl park, this long-awaited facility is designed to provide stability, support services, and […]

the post madison’s first permanent men’s shelter prioritizes sustainability & dignity first appeared on 华体会英超赞助商 - engineers and planners.

]]>
for decades, men experiencing homelessness in madison sought shelter in temporary spaces, often in church basements or emergency accommodations. that will soon change with the construction of the city’s first permanent men’s homeless shelter, bartillon shelter. located at 1902 bartillon drive near reindahl park, this long-awaited facility is designed to provide stability, support services, and a welcoming environment for up to 250 residents.

developed through a partnership between the city of madison, dane county, and non-profit operators, the shelter is a crucial step toward addressing the city’s ongoing housing crisis. in addition to providing a safe place to sleep, the shelter will include dormitory-style sleeping quarters, a commercial kitchen and laundry facility, an outdoor patio, and dedicated space for support services. sustainability features, such as solar panels and a rainwater collection system, have also been incorporated into the design to minimize environmental impact.

creating a welcoming & sustainable space

to ensure the shelter met both functional and community-oriented goals, snyder & associates provided site engineering and landscape architecture services that emphasized sustainability, accessibility, and dignity. our team worked closely with city and county officials, design consultants, and non-profit shelter operators to develop an efficient and non-institutionalized layout that removes stigma and fosters a sense of community.

a key objective of the project was to achieve leed certification, reflecting the shelter’s commitment to environmental stewardship. sustainable elements include the use of permeable pavers and a buried stormwater cistern, which help manage runoff while allowing for rainwater harvesting. this collected water will be reused for toilets and irrigation, reducing the facility’s reliance on municipal water supplies. native prairie vegetation was incorporated into the landscape design to support pollinators, improve soil health, and lower long-term maintenance costs. additionally, the building incorporates a geothermal system to enhance energy efficiency and a green roof to further improve insulation and stormwater management.

overcoming design & site challenges

as with any large-scale project, the shelter’s development presented unique challenges. the structured user program required careful 2022世界杯32强预选赛 to ensure ada compliance, accommodate queuing needs, and maintain clear sightlines for security while preserving a sense of openness. operational considerations, such as intake procedures and 24-hour staffing, were also factored into the site design.

from an engineering perspective, the shelter’s location within a wellhead protection zone required thoughtful stormwater management solutions to safeguard drinking water sources. additionally, limited square footage and unsuitable soils necessitated innovative space 2022世界杯32强预选赛 and infrastructure solutions to maximize functionality without compromising safety or comfort.

a model for future shelters

bartillon shelter is on track for completion by early 2026. once finished, it will not only provide a critical resource for those in need but also serve as a model for future shelter projects across the region. by integrating sustainable practices, prioritizing accessibility, and fostering a welcoming environment, this project reflects a broader shift in how communities address homelessness.

snyder & associates is proud to play a role in this transformational effort, helping to create a space that supports madison’s most vulnerable residents while setting a new standard for sustainable and dignified shelter design.

the post madison’s first permanent men’s shelter prioritizes sustainability & dignity first appeared on 华体会英超赞助商 - engineers and planners.

]]>
//www.dicovercards.com/projects/madisons-first-permanent-mens-shelter-prioritizes-sustainability-dignity/feed/ 0
ziggy park ball field: a lasting gift to the deforest & windsor communities //www.dicovercards.com/projects/ziggy-park-ball-field-a-lasting-gift-to-the-deforest-windsor-communities/ //www.dicovercards.com/projects/ziggy-park-ball-field-a-lasting-gift-to-the-deforest-windsor-communities/#respond mon, 09 jun 2025 09:11:06 +0000 //www.dicovercards.com/project/ziggy-park-ball-field-a-lasting-gift-to-the-deforest-windsor-communities/ snyder & associates is proud to have played a key role in the development of ziggy park, a new baseball facility in the village of deforest that enhances the community’s recreational offerings while honoring local history. named in recognition of dwight and bonnie ziegler’s lifelong contributions to the area, ziggy park is a testament to […]

the post ziggy park ball field: a lasting gift to the deforest & windsor communities first appeared on 华体会英超赞助商 - engineers and planners.

]]>
snyder & associates is proud to have played a key role in the development of ziggy park, a new baseball facility in the village of deforest that enhances the community’s recreational offerings while honoring local history. named in recognition of dwight and bonnie ziegler’s lifelong contributions to the area, ziggy park is a testament to their passion for athletics and community engagement. situated on 7.8 acres at the west end of the master-planned bear tree farms development, the facility serves high school, college, and adult recreational baseball players while also providing valuable park and green space for the villages of deforest and windsor.

a vision rooted in community and tradition

a sunset game at the new ziggy park ball field.

ziggy park is more than just a ball field—it is a gift steeped in deforest-windsor lore. dwight and bonnie ziegler, both deforest high school graduates, grew up immersed in local baseball culture and recognized the importance of teamwork and sportsmanship. with a desire to create a lasting impact, they envisioned ziggy park as a place where future generations could experience the joys of competition and camaraderie. their generous donation of the field to a local non-profit organization ensures that their vision will endure for years to come.

designing for functionality and accessibility

the project’s primary goal was to fulfill the village’s comprehensive plan by providing the necessary recreational space to meet community needs. snyder & associates worked closely with the village staff, contractors, and ownership to create a design that accommodates a variety of user groups while ensuring accessibility and functionality. the result is a state-of-the-art baseball facility featuring a synthetic turf infield and a natural grass outfield, designed to withstand heavy use while maintaining excellent playability.

overcoming challenges through collaboration

professional lighting system allows games in the evening hours.

the project presented several challenges, including the site’s steep topography and the need to balance design aspirations with budget constraints. our team strategically coordinated with the nearby subdivision’s general contractor to optimize earthwork, ultimately reducing costs while maintaining construction schedules. this collaboration was essential to the successful installation of stormwater and utility infrastructure, paving the way for a high-quality final product.

a community asset for generations to come

ziggy park opened in the summer of 2023, providing an immediate benefit to local athletes and the broader community. in 2024, the addition of a large concession stand and restroom facility further enhanced the park’s amenities, making it a premier destination for baseball and recreation in deforest.

with a rich history and a thoughtful design that meets present and future needs, ziggy park is poised to remain a cherished community landmark. snyder & associates is honored to have contributed to this meaningful project, reinforcing our commitment to creating spaces that bring people together and enrich their communities.

the post ziggy park ball field: a lasting gift to the deforest & windsor communities first appeared on 华体会英超赞助商 - engineers and planners.

]]>
//www.dicovercards.com/projects/ziggy-park-ball-field-a-lasting-gift-to-the-deforest-windsor-communities/feed/ 0
radial collector wells strengthen water supply for atchison, kansas //www.dicovercards.com/projects/radial-collector-wells-strengthen-water-supply-for-atchison-kansas/ //www.dicovercards.com/projects/radial-collector-wells-strengthen-water-supply-for-atchison-kansas/#respond mon, 09 jun 2025 09:11:06 +0000 //www.dicovercards.com/project/radial-collector-wells-strengthen-water-supply-for-atchison-kansas/ reliable access to safe drinking water is essential for any community, and the city of atchison is taking proactive steps to enhance its raw water supply system. as part of these efforts, snyder & associates provided critical engineering support for the city’s new radial collector wells, designed to meet the growing water demands of residents, […]

the post radial collector wells strengthen water supply for atchison, kansas first appeared on 华体会英超赞助商 - engineers and planners.

]]>
reliable access to safe drinking water is essential for any community, and the city of atchison is taking proactive steps to enhance its raw water supply system. as part of these efforts, snyder & associates provided critical engineering support for the city’s new radial collector wells, designed to meet the growing water demands of residents, industries, and rural water customers. this innovative system will help supply the city’s water treatment plant, which requires a peak flow capacity of approximately 9 million gallons daily (mgd).

project scope & site challenges

the city’s water treatment plant is situated approximately 8,300 feet from the existing raw water pumping station and more than 12,000 feet from the new radial collector wells. compounding this challenge, the plant is located approximately 200 feet higher in elevation than the well field. to efficiently integrate the new wells into the system, 4,000 feet of new raw water main is being constructed to connect with the existing raw water pipeline. the project design prioritizes maximizing the use of the existing infrastructure while maintaining the operation of the current raw water intake pump station.

addressing surge control & system integrity

given the significant water volume being supplied, high static head, and high pumping head, the project required extensive analysis to implement effective surge control measures. to compound the complexity, the existing raw water main presents some unknowns due to its original design and condition. currently, daily operating flow and pressure data provide the only confirmed information on its performance. to safeguard potentially fragile sections of the pipeline, the new system has been engineered to prevent surge pressures from exceeding those currently experienced in daily operations.

high-capacity pump stations & operational flexibility

each radial well functions as a high-capacity pump station, equipped with three vertical turbine pumps powered by 500-horsepower electric motors. these pumps are controlled by variable frequency drives (vfds), allowing smooth startup and shutdown along with precise adjustments to match water demand. the system offers significant operational flexibility as pumps can function independently, in coordination with other pumps at the same well, in tandem with the second well, or in conjunction with the existing raw water pump station.

advanced control & reliability features

to further enhance reliability, specialized pump check valves and mechanical surge relief equipment have been incorporated into the system to prevent damage during unexpected shutdowns, such as power failures. additionally, both wells are fully integrated into the city’s scada system, enabling centralized control from the treatment plant. given the remote location of the wells and operational complexity, the control systems have been designed for maximum reliability, intuitive operation, and resilience against disruptions.

emergency preparedness & flooding considerations

an added challenge for the project is the potential for seasonal flooding, which could occasionally require boat access to the well sites. to mitigate operational risks, each well site is equipped with an emergency power system featuring large natural gas-fired emergency generators with automatic operation, ensuring uninterrupted service even in the event of power outages.

sustainable water future for atchison community

through strategic engineering and system integration, the city of atchison’s new radial collector wells will provide a more resilient and efficient raw water supply, reinforcing the city’s commitment to reliable water access for years to come. snyder & associates is proud to contribute to this critical infrastructure improvement, partnering with lre water to deliver innovative, long-term solutions that secure atchison’s water future through essential hydrogeologic expertise.

the post radial collector wells strengthen water supply for atchison, kansas first appeared on 华体会英超赞助商 - engineers and planners.

]]>
//www.dicovercards.com/projects/radial-collector-wells-strengthen-water-supply-for-atchison-kansas/feed/ 0