parks - snyder & associates - engineers and planners - 世界杯2022年预选赛 //www.dicovercards.com fri, 03 oct 2025 19:05:07 +0000 en-us hourly 1 //www.dicovercards.com/wp-content/uploads/2025/06/cropped-cropped-snyder_meatball-1-32x32.png parks - snyder & associates - engineers and planners - 世界杯2022年预选赛 //www.dicovercards.com 32 32 inclusive playground & park improvements for pella’s kiwanis park //www.dicovercards.com/projects/inclusive-playground-park-improvements-for-pellas-kiwanis-park/ //www.dicovercards.com/projects/inclusive-playground-park-improvements-for-pellas-kiwanis-park/#respond mon, 09 jun 2025 09:09:01 +0000 //www.dicovercards.com/project/inclusive-playground-park-improvements-for-pellas-kiwanis-park/ meaning “miracle play” in dutch, “wonder spelen” is a pella-based nonprofit organization formed to raise money to create an all-inclusive park for children with disabilities. when the idea for creating this outdoor wonderland was proposed in 2018, pella city council members viewed the plan as an opportunity to turn the popular kiwanis park into a regional […]

the post inclusive playground & park improvements for pella’s kiwanis park first appeared on 华体会英超赞助商 - engineers and planners.

]]>
two adults read a playground sign

attractive signage at the entrance recognizes the numerous donors that made wonder spelen possible.

meaning “miracle play” in dutch, “wonder spelen” is a pella-based nonprofit organization formed to raise money to create an all-inclusive park for children with disabilities. when the idea for creating this outdoor wonderland was proposed in 2018, pella city council members viewed the plan as an opportunity to turn the popular kiwanis park into a regional destination. the local kiwanis club immediately got to work to raise money for the park through fundraisers, private donations, and 世界杯足球比赛预选赛 contributions.

the city of pella hired the team from snyder & associates to develop a comprehensive master plan for the park improvements that would complement the city’s distinct dutch aesthetic while incorporating the necessary amenities for inclusive play. our team also worked with custom building designers from romtec to create a specialized restroom building to match the town’s theme.

importance of inclusive play for all children

approximately 13% of children in the united states are served by the individuals with disabilities education act (idea).

several stand-alone play structures can accommodate wheelchairs.

yet, this broad population segment is often lacking regarding safe, sensory-appropriate playground facilities. while ada requirements call for accessible pathways to playground equipment, an appropriate ratio of ground-level play activities versus those higher up on the structure, and transfer platforms for children with mobility devices, inclusive playgrounds go further. these facilities are designed to be welcoming, engaging, and challenging for all children and provide opportunities to develop cognitive, sensory, physical, and social skills.

inclusive playgrounds feature a variety of environments where children can engage at their own pace and sensory input level. they’re also welcoming to parents and caregivers, many of whom may have a disability, as well.

multi-phase plan allows for staged building process

our multi-phase park improvement plan took advantage of the available open space in kiwanis park to create a new parking area, inclusive playground structures, and an eight-foot-wide trail and sidewalk network to provide direct access to the play areas. the addition of interactive playground equipment, accessible restroom building, and sensory play equipment were the main pieces constructed for the project’s first construction phase. because kiwanis park was already home to an open shelter house, tennis and pickleball courts, and a basketball court, the new play area fit seamlessly with the park’s recreational styling.

playground improvements staging plan.

the romtec-supplied restroom building is a unique and attractive structure that stands out in the park yet fits well with the park’s design. the building is composed of two shades of tan and grey blocks arranged in a pattern that continues onto the faux chimney stacks and provides a distinct and uniform appearance. in addition, decorative shutters installed on the face of the building frame the drinking fountains and continue the dutch theme. the structure also contains a large mechanical room with ample space to access plumbing and accommodate equipment storage.

while the phase one upgrades opened to the 世界杯足球比赛预选赛 in october 2021, the enhancements to the park will continue in phases two and three of the project. phase two includes various new landscaping trees and plants, planting beds, two shade structures, and another play zone. phase three will expand the parking lot, create more trails and walkways, and expand the community garden.

as future upgrades continue in kiwanis park, the city leader’s vision of the park becoming a regional destination will quickly come to fruition. the new state-of-the-art “wonder spelen” inclusive playground is positioned to serve children and adults of all ages and abilities for many years, helping people play together and ensuring no one is left out.

the post inclusive playground & park improvements for pella’s kiwanis park first appeared on 华体会英超赞助商 - engineers and planners.

]]>
//www.dicovercards.com/projects/inclusive-playground-park-improvements-for-pellas-kiwanis-park/feed/ 0
first avenue trail creates council bluffs connection //www.dicovercards.com/projects/first-avenue-trail-creates-council-bluffs-connection/ //www.dicovercards.com/projects/first-avenue-trail-creates-council-bluffs-connection/#respond mon, 09 jun 2025 09:08:30 +0000 //www.dicovercards.com/project/first-avenue-trail-creates-council-bluffs-connection/ formally adopted by the city of council bluffs in 2015, the west broadway corridor plan was developed to guide the transformation of this busy stretch of roadways into a walkable, eye-catching urban streetscape. the plan also proposed redeveloping the former railroad line parallel to west broadway into a multi-modal recreational trail with open plaza areas […]

the post first avenue trail creates council bluffs connection first appeared on 华体会英超赞助商 - engineers and planners.

]]>
formally adopted by the city of council bluffs in 2015, the west broadway corridor plan was developed to guide the transformation of this busy stretch of roadways into a walkable, eye-catching urban streetscape. the plan also proposed redeveloping the former railroad line parallel to west broadway into a multi-modal recreational trail with open plaza areas and other bike-friendly amenities. the entire corridor is 66-feet-wide with the southern half targeted for the trail and other pedestrian features. at the same time, the northern side is being preserved for future transit features that would also connect to omaha. extending just under two miles from 14th to 35th streets, the new trail would also fill a critical gap in the regional trail system. city leaders teamed with the trail designers from snyder & associates to develop this transformative trail section.

using the acronym first ave (furthering interconnections, revitalization, streetscapes, transportation, and aesthetics for a vibrant economy), the first avenue trail project was designed to enhance the operation of the west broadway neighborhood and provide opportunities for redevelopment of blighted industrial properties. it will connect neighborhoods, schools, and businesses and provide a safe route for pedestrians and cyclists to travel across council bluffs to the riverfront, the bob kerrey pedestrian bridge, and downtown omaha.

unique design amenities honor railroad heritage

the extra-wide first avenue trail provides plenty of space for several modes of transportation. photo credit: ashley kruse, city of council bluffs

the snyder & associates designers created a plan to establish an extra-wide trail along the project area. suitable for several modes of transportation, one section of the trail has a 10-foot-wide middle section paved in asphalt for bicyclists and other faster-moving micro-mobility devices, such as e-scooters. at the same time, two-foot-wide concrete shoulders along both edges were included for slower-moving pedestrians. due to a design change, another portion of the trail is proposed to be wider, with a 12-foot middle section with two-foot-wide concrete shoulders.

more than just a trail, however, our team created a space that provides a unique user experience along the nearly two-mile-long corridor. described by many as more of a “linear park,” the area along the trail includes attractive landscaping, several 世界杯足球比赛预选赛 green spaces, and trail plazas located every three to four blocks. the plazas were designed to pay homage to the former rail line running through the area and include industrial design aspects and materials incorporated into the amenities.

the plazas also include a variety of wayfinding signage, bicycle parking, shade structures, benches, and pedestals for holding 世界杯足球比赛预选赛 art pieces in the future. a local, private business plans to add a bike-sharing station adjacent to a plaza once it’s completed. this will allow patrons to rent a bike to ride along the trail and conveniently return to other bike-share locations. additionally, since the trail runs along the backside of many businesses along west broadway, city leaders hope to start a mural program to display artistry on the back walls facing the trail.

bicyclists are already taking advantage of the new trail system. photo credit: ashley kruse city of council bluffs

special features were included where the first avenue trail passes thomas jefferson high school. this includes an attractive black, welded-wire fence with gates, ada-compliant ramps leading to the school, and long seating walls for students and trail users. additional landscaping along this section ties in with the rest of the trail. to accommodate early-morning and late-night trail users, the two-mile section has decorative lighting to create a safer user experience.

anticipated development & recreational opportunities

city leaders anticipate the first avenue trail project will spur the development of other high-density residential and mixed-use facility efforts. they expect the district will greatly benefit from the multi-modal corridor and add to the residential base needed to support expanded commercial uses along the west broadway corridor.

the first phase of construction on the trail project included the section extending from 35th to 25th street. construction on the 16-foot-wide, phase-two section, which extends from 25th street to the 14th street area, will begin in the summer of 2022. at this location, the trail will link with existing trail sections on the east side of town. plans also call for adding a new community park near this juncture on the east side of indian creek. this park would add to the community-focused amenities established by creating the first avenue trail. as professionals who also live and work in the council bluffs community, the snyder & associates team is proud of this transformational project.

the post first avenue trail creates council bluffs connection first appeared on 华体会英超赞助商 - engineers and planners.

]]>
//www.dicovercards.com/projects/first-avenue-trail-creates-council-bluffs-connection/feed/ 0
park master 2022世界杯32强预选赛 : ames miracle league field & playground //www.dicovercards.com/projects/park-master-2022世界杯32强预选赛 -ames-miracle-league-field-playground/ //www.dicovercards.com/projects/park-master-2022世界杯32强预选赛 -ames-miracle-league-field-playground/#respond mon, 09 jun 2025 09:00:39 +0000 //www.dicovercards.com/project/park-master-2022世界杯32强预选赛 -ames-miracle-league-field-playground/ over 500 children and 300 adults living in story county with special needs will benefit from the new ames miracle league field and all-inclusive playground at inis grove park. the core project purpose is: facilitating a community vision that encourages inclusive play and social equity. developing a plan with strategies and tactics for addressing community […]

the post park master 2022世界杯32强预选赛 : ames miracle league field & playground first appeared on 华体会英超赞助商 - engineers and planners.

]]>
over 500 children and 300 adults living in story county with special needs will benefit from the new ames miracle league field and all-inclusive playground at inis grove park. the core project purpose is:

  • facilitating a community vision that encourages inclusive play and social equity.
  • developing a plan with strategies and tactics for addressing community concerns and site challenges.
  • creating a unique and valued vision that encourages donations and community investment.

the project was led, managed, and supported by a diverse snyder & associates’ team comprised of landscape architects, engineers, and surveyors. as the prime project consultant, we championed all plan components and served as the direct contact to the client and miracle league committee. a site inventory and analysis of existing park uses, natural features, and circulation was completed to help guide creation of the master plan.

park master plan addresses property constraints

working with city staff, we helped facilitate 世界杯足球比赛预选赛 engagement while developing and preparing the park master plan. community education and outreach materials were provided on miracle league requirements along with universal and all-inclusive design principals. during the 世界杯足球比赛预选赛 outreach and input process, we also addressed misconceptions regarding accessibility, ada requirements, and playgrounds. concerns over the location of the park were fielded by our team and addressed while achieving the goals of the larger community. key concerns and solutions include:

  • stormwater management – stormwater will be captured and treated on-site using a series of stormwater basins.
  • traffic & parking – other than the addition of five accessible stalls marked to accommodate miracle league activities. existing parking areas are expected to meet user needs.
  • noise – audio equipment will be used in a limited capacity and is primarily for the miracle league field game use to show support for athletes. sound will be directed toward viewers and away from neighboring residents to mitigate noise concerns.
  • visual – strategic tree plantings will complement and extend the nearby natural, wooded environment into the play area, provide a visual buffer from neighboring properties, and increase shade within frequently used areas.
  • safety – a fence along the ravine will help support safe play and recreation for all users.
  • lighting – a controlled led lighting system reduces glare and provides a bright, uniform light source directed onto the field. use of controlled lighting will also protect from light pollution in the sky and onto neighboring properties. light placement is based on the need to light the field evenly and ensure the ball in play is lit from all sides.

the post park master 2022世界杯32强预选赛 : ames miracle league field & playground first appeared on 华体会英超赞助商 - engineers and planners.

]]>
//www.dicovercards.com/projects/park-master-2022世界杯32强预选赛 -ames-miracle-league-field-playground/feed/ 0
park master 2022世界杯32强预选赛 & design: hickory hill park //www.dicovercards.com/projects/park-master-2022世界杯32强预选赛 -design-hickory-hill-park/ //www.dicovercards.com/projects/park-master-2022世界杯32强预选赛 -design-hickory-hill-park/#respond mon, 09 jun 2025 08:59:16 +0000 //www.dicovercards.com/project/park-master-2022世界杯32强预选赛 -design-hickory-hill-park/ improving iowa city’s hickory hill park hickory hill park preserves 185-acres of wilderness in northeastern iowa city not far from downtown featuring wooded hillsides, established prairie, open fields, trails, and streams. snyder & associates was chosen to provide park design and master 2022世界杯32强预选赛 services for improvements. during the design process at a 世界杯足球比赛预选赛 engagement meeting, […]

the post park master 2022世界杯32强预选赛 & design: hickory hill park first appeared on 华体会英超赞助商 - engineers and planners.

]]>
improving iowa city’s hickory hill park

hickory hill park preserves 185-acres of wilderness in northeastern iowa city not far from downtown featuring wooded hillsides, established prairie, open fields, trails, and streams. snyder & associates was chosen to provide park design and master 2022世界杯32强预选赛 services for improvements.

during the design process at a 世界杯足球比赛预选赛 engagement meeting, the advisory committee, comprised of city staff and members of the friends of hickory hill park, and the 世界杯足球比赛预选赛 identified the park’s strengths and weaknesses along with project goals and objectives.

strengths

  • tremendous community resource
  • heavily used trails and picnic facilities
  • angled view of the hickory hill bridge

    filled with natural beauty providing a unique, tranquil setting within the city

  • strong volunteer group that helps to promote and maintain the park
  • year-round outdoor recreational opportunities
  • resource for nature education programs and birding
  • diversity of native plant communities
  • assorted trail routes

weaknesses & concerns

  • lack of visibility and entrance signage
  • lack of maintenance access, particularly to the northern and northeastern areas of the park
  • muddy/eroded trails and bridge damage due to flooding and unmanaged stormwater drainage
  • confusing trail system due to multiple user-made paths and a lack of wayfinding signage
  • concerns about dog walkers allowing dogs off their leashes
  • unauthorized camping in the park
  • a variety of site amenity styles creates a lack of identity
  • need for additional invasive species control and the removal of dead trees on or near trails
  • underutilized neighborhood park space at bloomington street and conklin avenue entrances
  • streambank erosion from increased runoff and stream flows

project goals & objectives

three trail types

to achieve project goals and objectives, three trail types are proposed.

  • primary trails—paved surface trail eight to ten feet wide. this would improve park access and be built to meet americans with disabilities act (ada) guidelines.
  • secondary trails—granular surface trail six to eight feet wide to improve access and maintenance routes into the park’s core.
  • primitive trails—natural surface trail of bare ground, mown grass, or mulch chips. drainage improvements and trail rerouting would occur along the trails to reduce erosion and wetness.

the park design process involved site analysis, concept development, steering committee and 世界杯足球比赛预选赛 input meetings, master 2022世界杯32强预选赛 , cost opinions, and phasing.

two concept plans were developed with 世界杯足球比赛预选赛 and advisory feedback before the development of the final master plan. a final report was prepared which summarized the entire design process with proposed recommendations for implementation over a 15-year period. learn more by viewing the hickory hill park master plan.

the post park master 2022世界杯32强预选赛 & design: hickory hill park first appeared on 华体会英超赞助商 - engineers and planners.

]]>
//www.dicovercards.com/projects/park-master-2022世界杯32强预选赛 -design-hickory-hill-park/feed/ 0
gallery garden park provides urban-style green space //www.dicovercards.com/projects/gallery-garden-park-provides-urban-style-green-space/ //www.dicovercards.com/projects/gallery-garden-park-provides-urban-style-green-space/#respond mon, 09 jun 2025 08:59:02 +0000 //www.dicovercards.com/project/gallery-garden-park-provides-urban-style-green-space/ pocket park creates relaxing spot for marshalltown business district located just down the block from the iconic orpheum theater, the gallery garden park in marshalltown, iowa was built on the site of a former historic building that was destroyed in a fire. under new ownership, the now vacant lot was viewed as the prime location […]

the post gallery garden park provides urban-style green space first appeared on 华体会英超赞助商 - engineers and planners.

]]>
pocket park creates relaxing spot for marshalltown business district

located just down the block from the iconic orpheum theater, the gallery garden park in marshalltown, iowa was built on the site of a former historic building that was destroyed in a fire. under new ownership, the now vacant lot was viewed as the prime location to create a mini-park for 世界杯足球比赛预选赛 use.

snyder & associates was brought on board to provide 2022世界杯美洲杯预选赛 and landscape architecture on this ambitious project. this elaborate space features not only tables and seating but also a sunken plaza with an evaporation pool and an elevated water fountain feature for noise masking. a vertical live wall garden is ringed by elevated planters around the perimeter and a large, steel pergola creates a shady space for relaxing.

“green” elements create a sustainable environment

a waterfall feature at the heart of the park creates a welcoming spot in downtown marshalltown. photo credit: marshalltown convention & visitors bureau

as our professional landscape architect, tim west points out, this park also provided the opportunity to include “green” elements in the design and address stormwater issues that had plagued the area in the past.

“this project is very unique,” said west. “rainwater is captured from the roof of the adjacent building, then stored in harvesting tanks that were buried on-site, then this water is pumped to service the central water fountain and irrigation of the live wall and landscape plantings. a water line is not part of the improvements, meaning all the water for the site comes from captured stormwater.” the further addition of permeable pavers and a bio-swale rain garden with native iowa plantings also promote water infiltration.

west further identifies other sustainable features. “the pergola supports solar panels, which provide shade for the patio and also provides electricity for the central water fountain and lighting of the pocket park.” producing roughly 7,000 watts of electricity, the 32 photovoltaic panels result in the park having a net-zero impact.

the green infrastructure elements included in our park master plan also resulted in the project receiving a grant. “the grant was secured from the iowa economic development authority,” said west. “the owner also paid to cover the cost, while the city of marshalltown also participated, assisting with costs associated with storm sewer improvements in the parking lot.”

innovative pocket park inspires community & viability of downtown

the gallery garden park has proven to be an invaluable addition to the marshalltown community. it provides a relaxing place for downtown shoppers to rest their weary feet, while local workers can take advantage of the serene space during a busy day to enjoy a quiet lunch. this beautiful mini-park has been incorporated into many community events and even exhibits 世界杯足球比赛预选赛 art displays throughout the year.

ribbon-cutting ceremony for gallery garden park. photo credit: mike donahey

“this pocket park is privately-owned but available to the 世界杯足球比赛预选赛 ,” said west. “the owners are very committed to downtown viability and the community and are extremely excited about how the community has embraced this project and space. i believe there will be more opportunities to recreate 世界杯足球比赛预选赛 space in downtown areas and this project is an example of how a successfully designed space can be an attraction and bring people together.”

the engineering team and landscape architects at snyder & associates pride themselves on leading the way with innovative and unique design concepts. the pocket park is just one more way we’re able to bring projects to life that improve the environment for our communities. contact our experts today if you’d like industry-leading guidance for your next park project — big or small.

the post gallery garden park provides urban-style green space first appeared on 华体会英超赞助商 - engineers and planners.

]]>
//www.dicovercards.com/projects/gallery-garden-park-provides-urban-style-green-space/feed/ 0
survey & conceptual layout of utilities & streets: tom hanafan river’s edge park //www.dicovercards.com/projects/survey-conceptual-layout-of-utilities-streets-tom-hanafan-rivers-edge-park/ //www.dicovercards.com/projects/survey-conceptual-layout-of-utilities-streets-tom-hanafan-rivers-edge-park/#respond mon, 09 jun 2025 08:58:34 +0000 //www.dicovercards.com/project/survey-conceptual-layout-of-utilities-streets-tom-hanafan-rivers-edge-park/ the city of council bluffs initiated a study and park 2022世界杯32强预选赛 process for the development of the riverfront and adjacent playland park neighborhood. as a member of the project team, snyder & associates was responsible for all aspects of surveying as well as the conceptual layout of utilities and streets. the culmination of the study and […]

the post survey & conceptual layout of utilities & streets: tom hanafan river’s edge park first appeared on 华体会英超赞助商 - engineers and planners.

]]>
the city of council bluffs initiated a study and park 2022世界杯32强预选赛 process for the development of the riverfront and adjacent playland park neighborhood. as a member of the project team, snyder & associates was responsible for all aspects of surveying as well as the conceptual layout of utilities and streets. the culmination of the study and land 2022世界杯32强预选赛 process was the completion of the tom hanafan river’s edge park.

snyder & associates provided topographic surveying, land surveying, utility location surveys, and right-of-way surveys for the project. all survey data and associated electronic files were transferred to the design team for preparing design and construction documents. supplying complete and accurate survey data, which required no additional action or follow-up for use in the final design, allowed the design team to focus on other elements of the project.

surveys included identification of federal levee boundaries, iowa dot interstate highway right-of-ways, local street right-of-ways, and private property boundaries. survey limits for the project extended from harrah’s casino parking lot south to several hundred feet north of the bob kerrey pedestrian bridge and from the banks of the missouri river to the “dry side” of the river levee. base plan preparation showing property lines, physical features, utilities, trees, and contours was accomplished upon completion of field surveys.

the post survey & conceptual layout of utilities & streets: tom hanafan river’s edge park first appeared on 华体会英超赞助商 - engineers and planners.

]]>
//www.dicovercards.com/projects/survey-conceptual-layout-of-utilities-streets-tom-hanafan-rivers-edge-park/feed/ 0
gypsum city off-highway vehicle (ohv) park design & master plan //www.dicovercards.com/projects/gypsum-city-off-highway-vehicle-park/ //www.dicovercards.com/projects/gypsum-city-off-highway-vehicle-park/#respond mon, 09 jun 2025 08:58:19 +0000 //www.dicovercards.com/project/gypsum-city-off-highway-vehicle-ohv-park-design-master-plan/ premiere atv destination gives new life to land & local economy located less than one mile southeast of fort dodge, the gypsum city off-highway vehicle (ohv) park is a premier destination for all-terrain vehicle (atv), dirt bike, and snowmobile riders, as well as other outdoor enthusiasts. situated on 800-acres of land formerly mined for gypsum, […]

the post gypsum city off-highway vehicle (ohv) park design & master plan first appeared on 华体会英超赞助商 - engineers and planners.

]]>
premiere atv destination gives new life to land & local economy

located less than one mile southeast of fort dodge, the gypsum city off-highway vehicle (ohv) park is a premier destination for all-terrain vehicle (atv), dirt bike, and snowmobile riders, as well as other outdoor enthusiasts. situated on 800-acres of land formerly mined for gypsum, it’s the largest 世界杯足球比赛预选赛 riding area in iowa with approximately 70-miles of trails, fully signed and groomed, that covers varying terrain dynamics to provide a unique riding experience.

after being mined, the land was deemed unsuitable for urban development, with few possible alternative uses. the diverse topography and natural landscape of fields, hills, and cliffs made the location ideal for ohv use. 2022世界杯32强预选赛 for the project began almost two decades ago as a collaborative effort between individuals and groups along with united states gypsum corporation representatives and state and local officials. snyder & associates was brought on board to provide 2022世界杯美洲杯预选赛 , landscape development, and master 2022世界杯32强预选赛 guidance for this ongoing and extensive project.

phased construction takes advantage of funding opportunities

campground in northern iowa

the campground currently accommodates 33 sites, with plans for more.

the ohv park project was separated into three distinct construction phases to capitalize on funding opportunities as they became available. during phase one construction, over 15 miles of trails were created through an area of rolling hills and open grasslands. this phase also included the building of a motocross course, a safety training area, two youth riding areas, and a parking lot capable of accommodating 350 vehicles with trailers.

during phase two, an additional 35-miles of trails were added, as well as day-use areas that included fishing ponds, improved trail safety measures, and property fencing. phase three consisted of the construction of an expansive campground with 33 sites, along with modern restroom and shower facilities. most recently, our team helped the organization place an amateur supercross track on the growing list of park amenities.

focused collaboration leads to award recognition

the snyder & associates team collaborated with the iowa department of natural resources (dnr), iowa department of transportation (dot), the city of fort dodge, webster county improvements corporation, and webster county conservation to design and construct this one-of-kind park. our team was also instrumental in developing the design for bringing electrical, a water main, and a force main sanitary sewer service to the park.

representatives from the gypsum city off-highway vehicle park accepted an annual achievement award in recognition of their outstanding use of recreational trails program (rtp) funds. hosted by the coalition for recreation trails, the ceremony was held in washington, d.c. during great outdoors week. at a cost of over $5.5 million, rtf funds were one of more than 27 grants that made the park possible without utilizing tax dollars.

master 2022世界杯32强预选赛 efforts continue park growth

gypsum city off-highway vehicle park map

as the park continues to grow and evolve, the snyder & associates team has remained active to help the organization create a roadmap for future development. this has included the compilation of a master plan that provides guidance for the development of future facilities, improvements to existing facilities, and how to maximize future funding and investment opportunities over the next twenty years.

among the tools used to compile the master plan was an online 世界杯足球比赛预选赛 input survey that collected feedback from the 世界杯足球比赛预选赛 , as well as park users. additionally, the team met with key stakeholders, business owners, and park staff to better understand potential expansion opportunities and service needs. from here, the team developed goals and the necessary components and implementation steps required to meet those goals.

numerous improvement opportunities are detailed in the master plan, including the addition of a playground, observation platforms, picnic shelters, and wash bays, along with a desire for rental storage units, a challenge course, trail expansion, and cottage rentals, to name a few. a further finding of the plan was the benefit of creating an “ohv friendly community” beyond the borders of the park. this would allow off-roaders the opportunity to ride their ohv vehicles around the community on predetermined roads and paths, opening a new door of revenue streams for local retailers, restaurants, and fuel stations.

the gypsum city ohv park has capitalized on the growing popularity of the off-roading lifestyle and community. with expert guidance from the snyder & associates team, the park is well-positioned to continue to grow in the years to come.

the post gypsum city off-highway vehicle (ohv) park design & master plan first appeared on 华体会英超赞助商 - engineers and planners.

]]>
//www.dicovercards.com/projects/gypsum-city-off-highway-vehicle-park/feed/ 0
all-inclusive playground & baseball field: ankeny miracle league //www.dicovercards.com/projects/ankeny-miracle-league-field/ //www.dicovercards.com/projects/ankeny-miracle-league-field/#respond mon, 09 jun 2025 08:58:03 +0000 //www.dicovercards.com/project/all-inclusive-playground-baseball-field-ankeny-miracle-league/ all-inclusive play opportunities for central iowa residents snyder & associates collaborated with the city of ankeny parks & recreation department, the ankeny kiwanis club, feh design, and others to develop and implement park plans for the ankeny miracle field and all-inclusive playground. with more than 5,000 special needs children in central iowa and over 800 […]

the post all-inclusive playground & baseball field: ankeny miracle league first appeared on 华体会英超赞助商 - engineers and planners.

]]>
all-inclusive play opportunities for central iowa residents
young boy in wheelchair playing on playground

a young boy enjoys opening day at ankeny miracle park.

snyder & associates collaborated with the city of ankeny parks & recreation department, the ankeny kiwanis club, feh design, and others to develop and implement park plans for the ankeny miracle field and all-inclusive playground. with more than 5,000 special needs children in central iowa and over 800 in ankeny alone, many children were underserved from a recreational facility standpoint.

project milestones included:

fall 2012 – construction began.

fall 2013 – miracle league field was completed and opened on september 7 for the first ankeny kiwanis miracle league season.

fall 2014 – the first phase of the playground designed for use by children ages five to 12 opened to the 世界杯足球比赛预选赛 along with the restroom and concession facility.

spring 2015 – the final two phases, a section designed for children ages two to five, and stand-alone equipment, were finished and opened to the 世界杯足球比赛预选赛 .

hailed as a safe and exciting play space for children of all ages and abilities, the park is a welcome asset to the community. the ankeny miracle league field is the second of its kind in iowa and the first to offer a co-located all-inclusive playground.

an athlete heads to first base during a baseball game on ankeny miracle league field.

noteworthy aspects of the park include a custom-designed, rubberized turf field that provides a flat, cushioned surface free of obstacles, a shelter with a concession stand, and a sensory rich, two-story playground. through the use of an extensive ramp system, individuals with mobility devices can access both stories of the equipment and enjoy unique views of the surrounding area. with over 14,000 square feet of play space, it’s the largest playground in ankeny. while the park is open to the general 世界杯足球比赛预选赛 , it’s also utilized for miracle league events and by the adjacent terrace elementary school for outdoor recess activities.

since fundraising began more than 600 businesses and individuals have donated to bring the $1.7 million project to fruition. with a dedication to foster more opportunities for iowa’s underserved population, snyder & associates donated professional services to prepare the park and baseball field design and construction documents for the project. the services provided included ada compliance review and analysis, gravity sewer design and operation, master 2022世界杯32强预选赛 , park 2022世界杯32强预选赛 and designsports field design, topographic survey, easements, and 3d modeling and promotional materials.

recognized by landscape structures as one of their most inspirational playgrounds, the ankeny miracle league park has become a popular playground destination for families across iowa. on the heels of its success and as part of a growing recreational trend, urbandale, ames, and other midwest communities are also home to miracle league facilities.

the post all-inclusive playground & baseball field: ankeny miracle league first appeared on 华体会英超赞助商 - engineers and planners.

]]>
//www.dicovercards.com/projects/ankeny-miracle-league-field/feed/ 0
all-inclusive recreational opportunities: urbandale miracle league field & playground //www.dicovercards.com/projects/all-inclusive-recreational-opportunities-urbandale-miracle-league-field-playground/ //www.dicovercards.com/projects/all-inclusive-recreational-opportunities-urbandale-miracle-league-field-playground/#respond mon, 09 jun 2025 08:58:03 +0000 //www.dicovercards.com/project/all-inclusive-recreational-opportunities-urbandale-miracle-league-field-playground/ ada-compliant sports field & playground design nestled among the little league fields at northview park in urbandale, iowa, the urbandale miracle league field, and the adjacent all-inclusive playground, provide recreational opportunities for children and adults with special needs. having rapidly grown in popularity over the past decade, these recreational amenities are designed to provide opportunities […]

the post all-inclusive recreational opportunities: urbandale miracle league field & playground first appeared on 华体会英超赞助商 - engineers and planners.

]]>
ada-compliant sports field & playground design

the first exhibition baseball game held at urbandale miracle league field.

nestled among the little league fields at northview park in urbandale, iowa, the urbandale miracle league field, and the adjacent all-inclusive playground, provide recreational opportunities for children and adults with special needs. having rapidly grown in popularity over the past decade, these recreational amenities are designed to provide opportunities for children of all ages and abilities (including those with disabilities) to safely use the equipment and participate in fun outdoor activities.

there are over 20,000 kids with disabilities in the des moines metro (and even more adults) and most playgrounds do not allow them to experience the fun and joy of being outdoors with their peers. the urbandale parks and recreation department reached out to the team with snyder & associates to design a space for an extraordinary, one-of-a-kind ballfield and inclusive playground (complete with a zipkrooz® by landscape structures) for children and families of all needs — enhancing the play experience for all metro residents.

the snyder & associates team has been leading the way in efforts to bring more of these special amenities to iowa and the midwest, with both ames and ankeny also being home to miracle league fields & all-inclusive playgrounds. central to the design of both features, the surfaces are cushioned, rubberized, and completely flat to help prevent injuries and eliminate any barriers to wheelchair users or visually impaired participants.

donated services help overcome cost barriers

our team donated a variety of professional services to prepare design and construction documents for park improvements, including ada-compliance review and analysis, topographic survey, gravity sewer design and operation, signage and monuments design, park 2022世界杯32强预选赛 and design, master 2022世界杯32强预选赛 , and sports field design. to help bring awareness to the fundraising efforts to build this project, the snyder & associates team also created display boards to exhibit at urbandale city hall and polk county 世界杯足球比赛预选赛 works. a 3-d model was produced and used to create an informational video that provided the 世界杯足球比赛预选赛 with a virtual tour of the finished project while it was still under construction.

other improvements to northview park included parking lot updates with additional handicap-accessible parking stalls and bus access. an entrance feature with inspirational baseball quotes that also honors donors, as well as bronze statues that promote all-inclusive play was also included. in addition to softball and baseball games, urbandale city leaders plan to utilize the miracle field to host kickball and other events for individuals of all ages and abilities.

inclusive play for the whole community

bronze statues at urbandale miracle league field promote all-inclusive play.

completed in spring 2018, the urbandale miracle league field and all-inclusive playground was celebrated with an opening day ribbon-cutting ceremony on may 4, 2018. the event included a community social and exhibition baseball game to kick off the 2018 outdoor sports season.

while our team provided numerous services to bring this project to life, it couldn’t have been completed without the collaboration of several groups and organizations, including polk county 世界杯足球比赛预选赛 works, the city of urbandale, the urbandale miracle league with representatives from urbandale community action network (ucan), the courage league, and residents.

visit the urbandale miracle league’s website for additional information on how this park will impact the community.

the post all-inclusive recreational opportunities: urbandale miracle league field & playground first appeared on 华体会英超赞助商 - engineers and planners.

]]>
//www.dicovercards.com/projects/all-inclusive-recreational-opportunities-urbandale-miracle-league-field-playground/feed/ 0
water needs drive the creation & evolution of ada hayden heritage park //www.dicovercards.com/projects/water-needs-drive-the-creation-evolution-of-ada-hayden-heritage-park/ //www.dicovercards.com/projects/water-needs-drive-the-creation-evolution-of-ada-hayden-heritage-park/#respond mon, 09 jun 2025 08:57:46 +0000 //www.dicovercards.com/project/water-needs-drive-the-creation-evolution-of-ada-hayden-heritage-park/ protecting an emergency water source the city of ames has used groundwater as its primary drinking water source for many decades. during unseasonably dry years, the hydraulic connection between this groundwater source and other area waterways has occasionally resulted in a reduction to their water supply. starting in the late 1970s, the city started pumping […]

the post water needs drive the creation & evolution of ada hayden heritage park first appeared on 华体会英超赞助商 - engineers and planners.

]]>
protecting an emergency water source

the city of ames has used groundwater as its primary drinking water source for many decades.

aerial view of ada hayden park in ames iowa

this aerial view provides a birds-eye vantage of the ada hayden park.

during unseasonably dry years, the hydraulic connection between this groundwater source and other area waterways has occasionally resulted in a reduction to their water supply. starting in the late 1970s, the city started pumping water from hallett’s quarry, situated north of town, into the skunk river basin to help replenish the drinking water aquifer during these dry spells. while the city has mainly used this option only during times of exceptional drought to recharge the groundwater supply, it’s remained a viable solution as a secondary drinking water source.

when hallett’s quarry ceased operations in the 1990s, city leaders were concerned about the potential impact of proposed residential and commercial expansion on both the in-lake water quality, as well as the city’s continued access to the water for streamflow augmentation. presented with a unique opportunity, the city of ames held a successful bond referendum to acquire 437 acres of land surrounding and including the abandoned sand and gravel quarry to expand their recreational offerings and protect their secondary water supply source.

improving water quality through sustainable wetlands

at the time of the city’s acquisition, the newly renamed ada hayden heritage park wasn’t much of a park. remnants of the quarry included two lakes with an approximate surface area of

winding ada hayden trail alongside an established prairie area

native vegetation was re-established in the prairie areas.

125-acres but nothing else in the way of native vegetation or active wildlife. the professionals with snyder & associates were enlisted to provide design and construction documents for more than 350 acres of the site, including utilities, parking lots, trails, restroom building, pedestrian bridge, shoreline improvements, and prairie restoration.

while the recreational amenities were important, the primary project goal remained the preservation of both bodies of water and improving their water quality. to that end, these multi-year improvements began with the construction of three bioengineered wetland treatment cells in the west and southwest portions of the site for the purpose of intercepting and filtering stormwater runoff from existing and future residential development in the area. the addition of the wetlands has reduced the average concentration of turbidity and total suspended solids (tss) reaching the lake, as well.

another major accomplishment was the stabilization of approximately three miles of shoreline. the use of heavy stones and rip-rap reduces the possibility of wind-blown erosion and creates better shoreline access. additionally, when the city acquired the property, the quarry consisted of two large lakes separated by a central causeway. for better recreational access, the causeway was opened to allow the movement of boats between the two lakes.

a secondary gravel ada hayden trail leading to wetlands and prairie areas

the wetlands and prairie are easily accessible through the secondary trail network.

user access & recreational opportunities

to accommodate many of the recreational features and attract native wildlife, our team also developed a plan to restore much of the existing parkland to open prairie. now, it’s not uncommon for rare bird species such as loons, sandhill cranes, and bald eagles to be spotted in the park. the entire park is fully accessible by approximately three miles of hard surface trail and two miles of secondary gravel trail. the secondary gravel trail allows visitors access to the native prairie and wetland features within the park.

site visitors will also appreciate other conveniences such as restroom facilities, a picnic shelter, a boat launch, ample parking for cars and boat trailers, an ada-compliant fishing dock, and a pedestrian bridge spanning the opening in the causeway. our team worked in close coordination with the iowa department of transportation (dot), the united states army corps of engineers (usace), iowa department of natural resources (dnr), and the story county conservation board during park 2022世界杯32强预选赛 , design, and the multiple permitting phases of the project.

landscape view of the ada hayden pedestrian bridge from across the lake

the pedestrian bridge along the causeway adds a new dimension to the park’s trail network.

the post water needs drive the creation & evolution of ada hayden heritage park first appeared on 华体会英超赞助商 - engineers and planners.

]]>
//www.dicovercards.com/projects/water-needs-drive-the-creation-evolution-of-ada-hayden-heritage-park/feed/ 0